What it brings to your staffing decision

NORMAS calculates staffing needs from workload measured with work study methods and from real working capacity; the result becomes a defensible table, with its rationale.

Norm kadro

Staffing decisions often rest on guesswork, not measurement

  • Headcount is set by “we need more people” or by last year's number; workload is not measured.
  • Blue- and white-collar work are measured the same way; knowledge work with a stopwatch, repetitive work with a survey.
  • On 24/7 posts it is forgotten that one person cannot work the whole year because of leave and holidays.
  • When people's declared times are added up, workloads appear that exceed annual capacity and cannot be real.
01

The right method for the work

A primary and an alternative method are suggested from nine methods, based on collar, cycle, post and volume data, with a rationale.

02

Real capacity

Annual effective hours from each position's working calendar and shift pattern; the shift factor for continuous posts.

03

Workload person by person

Each person in a position is measured separately; workload, norm and utilization show per person and in total.

04

Rounds that catch overload

Declarations above 110% of gross capacity are listed; the Second Analysis is with the person, the Third with a line manager.

05

A transparent norm table

Workload ÷ effective hours, person rounding, difference, utilization and rationale; the difference becomes savings with collar-based cost.

06

AI assistance

Allowance and method suggestions, analysis review, job description consistency check, interpretation and management reports; the final decision stays with the consultant.

07

Share-ready outputs

The norm report and effort table as PDF, analysis detail as Word, overload lists as Excel and the final report as PowerPoint.

08

Built on consulting experience

NORMAS was built on Grupas's norm staffing and workforce analysis consulting experience; every phase has a work study method guide, and it runs in the browser with nothing to install.

The flow of a norm staffing study

Six capabilities, one application

NORMAS capabilities follow the natural order of a staffing project: plan, set capacity, choose the method, measure, verify and decide.

  1. PLANPlan
  2. TIMESet capacity
  3. METHODChoose the method
  4. LOADMeasure
  5. 110%Verify
  6. NORMDecide
Roles that use it

For any organization whose work can be measured

Manufacturing and industry

Shift-based lines, maintenance, quality, warehouse and logistics, plus the administrative staff behind them — blue and white collar together.

Services, public sector and healthcare

24/7 posts, call and service desks, application and file work; Erlang C for queue-based work.

HR and consulting

HR teams doing organization and headcount planning, and consulting teams running norm staffing projects.

  • HR and organization managers
  • Top management and finance
  • Work study specialists and industrial engineers
  • Consultants running norm staffing projects

Base your staffing decision on measurement with NORMAS

Write to us for a live walkthrough on sample data.

WhatsApp
GURU

GURU · NORMAS assistant

Ask about features, licenses and the norm staffing method.

+90 538 390 29 78 info@grupas.com.tr
Hi, I'm GURU! I can answer your questions about NORMAS and work-study-based norm staffing (standard time, allowances, effective time, shift factor, measurement methods).